DOD SR400D Specifikace Strana 184

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 244
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 183
176
PERFORMANCE CHECKLIST FOR THE
LONDON AIRE XK ULV SPRAYER
TESTING OF ENVIRONMENTAL CONDITIONS
FOR ULV APPLICATIONS
A. Check the weather conditions expected during the
spray operations, REMEMBER, YOU SHOULD NOT
CONDUCT ULV OPERATIONS IN THE RAIN OR IN
STRONG WINDS.
B. Check for a temperature inversion. A temperature
inversion has occurred when the air temperature at
six feet above the ground is at least one degree
warmer than the ground temperature. (This situation
usually occurs in the early morning and late evening
hours.)
C. Check the wind speed by using a wind-measuring
device. The indicated wind speed should fall
between 4-6 MPH and should be blowing across the
intended target area.
SETUP PROCEDURES
 1. Place the ULV unit in a pickup truck or on a trailer
and secure it or prepare for towing.
 2. Check the fuel level. Add regular unleaded as
needed.
Zobrazit stránku 183
1 2 ... 179 180 181 182 183 184 185 186 187 188 189 ... 243 244

Komentáře k této Příručce

Žádné komentáře