TESTING OF ENVIRONMENTAL CONDITIONS FOR ULV
A. Check the weather conditions expected during the
spray operations, REMEMBER, YOU SHOULD NOT
CONDUCT ULV OPERATIONS IN THE RAIN OR IN
STRONG WINDS.
B. Check for a temperature inversion. A temperature
inversion has occurred when the air temperature at
six feet above the ground is at least one degree
warmer than the ground temperature. (This situation
usually occurs in the early morning and late evening
hours).
C. Check the wind speed by using a wind-measuring
device. The indicated wind speed should fall
between 4-6 mph and should be blowing across the
intended target area.
SET-UP PROCEDURES FOR THE
LECO P-1 ULV SPRAYER (Fig. 2).
 1. Examine the fuel level in the gasoline tank. Fuel
note: For the first 20 hours of operation of a new
machine mix 8 oz of 2-cycle oil with 1 gallon of
unleaded gasoline. Use a mixture of 6 oz of 2-
cycle oil with 1 gallon of unleaded gasoline
thereafter.
 2. DO NOT MIX GASOLINE AND OIL DIRECTLY IN
THE ENGINE FUEL TANK.